• <dfn id="6gn27"><span id="6gn27"></span></dfn>
  • <div id="6gn27"></div>
  • Contact Us

    ADD: 16 Tongyi Road, Weihai City, China

    TEL: 86-0631-5233588

    FAX: 86-0631-5224345

    Current Location:Home > News center > Company news

    Main Structure of Phase II of Water Supply Project in Ozone, DRC Completed

    Release Time:2024-1-25 18:57:25

    On October 8, the concrete pouring of the second floor roof of the water treatment structure was completed, indicating the main structure was done in the second phase of Ozone water supply project in the Democratic Republic of the Congo. The project construction includes: administrative building, pharmaceutical warehouse, water treatment structure, backwashing pump room, clean water pool and homogenization pool, etc., with total concrete volume reaching 12,000 m3. The owner requires the main structure should be completed by October 31, 2023, half year ahead of schedule, so as to provide support to the presidential campaign. The project team arranged the process rationally, organized employees to work overtime, and completed the main structure 22 days ahead of the deadline required by the owner.

    Copyright:Weihai International Economic & Technical Cooperative Co., Ltd.(c) Address :16 Tongyi Road, Weihai City, China  Lu ICP, number 12002982, -3 TEL:86-0631-5233588  FAX:86-0631-5224345  Lu public network security 37100202000269Number  Technical Support:Aosion
    a视频在线无码免费_婷婷色制服中文字幕_中文字幕国产视频_天天在线无码字幕 日韩精品一区二区三区四区蜜桃 亚洲国产系列久久精品99人人 日韩动漫一区在线观看
  • <dfn id="6gn27"><span id="6gn27"></span></dfn>
  • <div id="6gn27"></div>